Trump Redevelopment, Florida
The Trump Redevelopment project consisted of three
phases: Trump Palace Condominium, Trump Royale
Condominium, and Trump Sonesta Hotel.
Trump Palace Condominium consisted of the construction of a
45 story, 278 unit tower with tri-level understructure parking
garage, cabanas, swimming pool, spa, water features, and
associated activities.
Trump Royale Condominium included the construction of a 45
story, 391 unit tower on a bi-level garage pedestal, swimming
pool and spa atop the garage, on-site and off-site dune
enhancement activities, and associated activities.
For both the Palace and Royale Condominiums, Coastal
Systems obtained the Department of Environmental Protection
(DEP) Coastal Construction Control Line (CCCL) Permits as
required for structures and activities that cross seaward of the
CCCL. Lighting plans, for exterior building and landscape
lighting, were approved by the Florida Fish and Wildlife
Conservation Commission (FWC) as part of the CCCL permit
proces. Coastal engineering analyses were provided to determine the
anticipated impacts of a 100-year storm event on the structures.
The 100-Year Storm Impact Analysis provided the anticipated
wave crest height, as well as the eroded profile associated with
a 100-year storm event. A Wave Load Analysis was also
conducted to provide the wave load forces on vertical walls and
columns during a 100-year storm event.
Additionally, Coastal Systems provided DEP CCCL permitting
services for the Trump Sonesta Hotel to construct a shaded
seating area seaward of the hotel and to provide dune
enhancement activities, landscaping, and lighting activities on
site. The lighting activities/plans were also approved by the
FWC as part of the CCCL permit process.
|