Home About Us Expertise Links Media Site Map Contact
Coastal Engineering Waterfront & Marinas Civil Engineering Regulatory Permitting Marine Environmental Site Investigations Construction Destination Development
Federal Dredge - Fill Permits
Environmental Resource Permits
Joint Coastal Construction Permits
Marine Turtle Lighting Authorizations
Stormwater Management Permits
Florida Uniform Waterway Marker
State Lands Auhorizations
Local Coastal Construction Permits
Mangrove & Tree Permits
Dune / Native Vegitation Permits
FEMA Consultation & Variance Authorizations
State Coastal Construction Permits
South Beach Marriott Hotel, Florida

The nine-story Marriott hotel and understructure garage project included the remodeling of an existing historical two-story hotel. In addition to the new structure and remodeling of the existing hotel, the property included a single story retail building, swimming pool, spa, a walking trail, dune restoration and dune crossover/beach access structure.

Coastal Systems International, Inc. obtained the construction, coastal construction, and marine turtle lighting permits for this project. We worked with the Department of Environmental Protection, providing analysis and other back-up, in order to ensure that the shear wall percentage and impervious area necessary for the proposed design were approved. In addition, a 100-year Storm Impact Analysis was performed to evaluate storm recession and storm wave impacts associated with the return period. For the beach/dune system, we designed a cross over and analyzed the potential impacts of the proposed construction.

Download a printable PDF version of this project
South Beach Marriott, Florida