Rybovich
Marina , Florida
The Rybovich Marina Redevelopment project in West Palm
Beach will transform the waterfront in end of the City.
A $100M mixed - use development is planned that includes
condominium towers, townhouses and retail. The marina
will include 149 wet slips to accommodate megayachts and
125 dry slips. Coastal Systems designed the following
marine works for the project:
- 3,400 linear feet of steel
sheet piling
- 125,000 cubic yards of dredging
- Design of dredged material
placement areas near Little Munyon Island as
seagrass habitat
- 180 ft long concrete piers
for the 600-ton marine travelift
|
Coastal
Systems also performed a site-specific coastal engineering
study to provide design loads for the concrete floating
docks proposed for the marina and to evaluate wave attenuation
for the marina under both normal and storm conditions.
The design effort required extensive coordination with
a multi-disciplined design team to interface the marine
works with the floating dock manufacturer, upland civil
engineers, architects and specialty boatyard consultants.
Construction administration services were provided including
contract payment dredging hydrographic surveys.