|
Wyndham
Casa Marina, Florida
Coastal Systems International, Inc. provided coastal and
structural engineering services for the design and construction
of a swimming pier, fishing pier and platform at the Wyndham
Casa Marina Hotel. Soil borings were obtained to assist
in the preliminary and final designs, which were based
upon a conceptual design as illustrated in previously
approved DEP (Department of Environmental Protection)
permit sketches. The final design consisted of concrete
piling and caps with a combination of precast
concrete panel and IPE wood decking. Boat slips were added
at the end of the pier. Coastal Systems also provided
assistance to the client in evaluating bids and awarding
the construction contract. Coastal Systems provided construction
administration services to ensure the project was completed
in compliance with the approved plans.
|
|
|
|
|